Project
Morgan Lake Estates Basement Floor
Inside the gates at Morgan Lake Estates in Brighton: a wide-open walkout basement that went from bare concrete to large-format white tile. Completed by Angry Cat Contracting.
This one sits inside the gates at Morgan Lake Estates, the gated community in Brighton. The basement is a big open room with a wet bar, white columns, a black painted ceiling and a sliding door out to the yard, and when we took these first photos the floor was bare concrete from wall to wall, with an old patch of tile by the slider.
We ran large-format white tile across the whole room and into the wet bar. The photos go from the concrete to the finished floor.

The same wet bar, before and after. Drag the handle to compare.
Before
What we started with




The finished project
What we handed back





Related services
What else we build
Want a number on it?
Estimates are free. Tell us what you’re thinking about doing and we’ll come take a look.
