Kitchen Remodeling
Same process. Same standard.
Complete kitchen renovations — cabinets, flooring, electrical, plumbing and finish work. Shown below: real jobs from Plymouth and Garden City, from the first swing of demo to the finished room.
- 4wkTypical remodel
- 5yrWorkmanship warranty
- 5.0★Google rating
Real kitchen projects
Kitchens we’ve actually built.
Not just glamour shots — the befores and the construction photos too, because how a kitchen is built matters as much as how it photographs.
Before · construction · finished
The Plymouth kitchen, start to finish.
Full-project capability
A kitchen touches every trade in the house: framing, plumbing, electrical, drywall, flooring, cabinets, counters, tile and paint. We handle the project as one scope with one person responsible — Tony — instead of a parade of subcontracted strangers. When a wall needs to come out, we determine what’s structural and what’s living inside it before the proposal is final, the way we did when we opened the load-bearing wall in the Garden City kitchen.
Finish selections can include
Cabinets, countertops, sink and faucet, flooring, lighting, backsplash, hardware and appliances where applicable. We can establish the finish-material allowance with you and help with selections so you don’t have to figure everything out alone.
Pricing
What does a kitchen remodel cost?
One project price covers our labor and the standard building materials. A typical standard timeline is about 3–4 weeks, scope dependent.
Kitchen remodel
Angry Cat project priceCabinet lead times are the one part of a kitchen we can’t compress — we’ll build them into the schedule so the construction window stays tight.
Featured transformation
Real project. Real before and after.
5.0 average · 30 Google reviews
What homeowners say about this work.
They took the imperfections of a 1941 bungalow kitchen to the studs and created an exquisite modern kitchen without any squeaks, misalignments or cracks to name a few… Tony is amazing at his pre-design presentation and cost summary. Nothing was hidden or added on to the original w/o communication with us first.
Frances CollinsKitchen remodel I truly appreciate someone who shows up when expected and communication throughout the job. That is what you will get from Angry Cat Contracting. Absolutely no complaints with the workmanship. Cutting corners is not the way they work.
Claire BeaudetKitchen remodel I knew I was choosing the right contractor when I told Tony I was picky, and his simple answer was “That’s ok, so am I.” He gave me a timeline, and exceeded our expectations. Good contractors are hard to come by, I’m glad I found mine
James BrennanRemodel
Common questions
Straight answers.
A standard kitchen remodel is typically around three to four weeks once construction begins. Larger layout changes, specialty materials, cabinet lead times, structural work or extensive plumbing and electrical changes can extend the schedule.
We handle cabinet installation as part of kitchen remodeling. Countertops are commonly measured and fabricated after the cabinets are installed, and we coordinate the project so the countertop portion fits into the overall schedule and scope.
Yes, depending on the home and layout. Moving appliances or the sink can require plumbing, electrical, gas, venting or framing changes. We’ll look at what’s involved during planning and include the agreed work in the proposal.
No. We can establish a finish-material allowance and help you through selections. Kitchen finish selections can include cabinets, countertops, sink and faucet, flooring, lighting, backsplash, hardware and appliances where applicable.
Yes, when the structure allows it. Before removing or changing a wall, we need to determine whether it is structural and what electrical, plumbing or HVAC may be inside it. We’ll go over those conditions before finalizing the scope.
Usually, yes, but you should expect the kitchen to be out of service for portions of the project. We’ll talk through the schedule and what will be unavailable so you can plan around the work.
If you decide to add or change something after the project starts, we’ll go over the change and any effect on price or schedule before moving forward. The goal is to keep the scope and cost clear instead of surprising you at the end.
Kitchen remodeling across Southeast Michigan
Related services
What else we build
The kitchen portfolio
Every finished kitchen photo we have.
Every photo below is an Angry Cat job. Click any of them to see that project’s full story.
Want a number on it?
Estimates are free. Tell us what you’re thinking about doing and we’ll come take a look.

